A twelve-desk office in a 1920s stone building, fitted without touching the original floor.

01 — Brief
What the building asked for, and what was decided.
01

The original Minton floor was retained and protected. Everything new sits on it, not into it.

02

Acoustics are handled with linen-faced panels behind the plaster line, not with a suspended ceiling.

03

Cable is carried in a brass surface channel along the skirting so the walls stay unchased.

Setting-out sheet for the brass channel. Nothing chased into the wall.
Setting-out sheet for the brass channel. Nothing chased into the wall.
02 — Specification
Named, sized and sourced before work began.
FlooringExisting Minton tile, retained, cleaned, sealed
WallsLime plaster, burnished, linen acoustic panels behind
DesksTeak, 25mm, 1600×750, shared runs of four
CablingBrass surface channel at skirting, no wall chasing
LightingBrass pendants on a 1600 grid, 2700K, dimmable
03 — Plates
Same lens, same height, same time of day.
Desk runs oiled in the workshop before fitting.
Desk runs oiled in the workshop before fitting.
04 — Sequence
One programme, one site lead, trades booked in order.
    Week 01

    Protection

    Original floor boarded and sealed before any trade entered.

    Week 03

    Services

    Brass channel set out, power positions confirmed with the tenant.

    Week 06

    Plaster

    Acoustic panels fixed, three coats of lime over.

    Week 09

    Joinery

    Desk runs fitted, levelled to the old floor's fall.

    Week 11

    Handover

    Floor protection lifted, tile condition photographed.

12
Weeks on site
35
Lines specified
8
Trades sequenced
Next on the schedule · 04

Shirgaon Farmhouse

Shirgaon, Alibaug · February 2025
Open →
Shirgaon Farmhouse, Shirgaon, Alibaug
Your project

Bring usthe shell.

Send the address, the approximate area and the month you would like to start. We reply within a week with a written note on what is possible.

Hands oiling a teak cabinet in the joinery workshop